Add to Cart
Customized Precision Stainless Steel Investment Casting , Investment Casting Products Lost Wax Casting Process
Product parameters
| Product Name | Customized Precision Stainless Steel Investment Casting , Investment Casting Products Lost Wax Casting Process |
| Size | Diameter: M1-M100 Length: 2mm-3000mm |
| Material | Carbon Steel, Alloy Steel, Stainless Steel,etc |
| Grade | 2, 4, 4.8, 5, 6, 6.8, 8, 8.8,10.9,12.9,14.9 |
| Finsh | Zinc plate (white,blue,yellow,black), Zn/Ni plating, Mechanical zinc plating, Cr3+, black oxide, Ni plate, brass plate, electrophoresis, dacromet, hot-dipped galvanized, positive electrode oxidization, etc. |
| The Most Precise Tolerances That GuJietong Can Process |
1) Shaft diameter below 6mm and maximum pore size tolerance up to 0.003mm |
| Production Equipment |
1) CNC Machining Center; |
| Measuring Instruments and Equipment |
1) micrometer |
| Preferred Drawing Formats | JPEG, PDF, CAD, IGS, STP |
| Preferred Industries |
1) Communication Equipments |
|
Our advantage |
Small MOQ can be accepted |
| Other services are consulted in dealing | If you have any inquiry, just feel free to contact and let me know which exactly item(type) you need, I will do my best to service you here |
1.ASTM 304,316(0Cr18N9,0Cr17Ni12Mo2 etc. Wide materials range,Most materials in ASTM,DIN and GOST standard)
2.Reach experience in material ASTM304,316.
3.CNC machining available
4.Proffesional process design to reduce cost
5.Proffesional moulds design to reduce cost
6.Excellent surface treatment
7.Small quantity order also OK
8.Surface treatment: Chrome-plating,polishing or others could be selected.
Q: How can I get the quotation?
A: Please send us information for quote: drawing, material, weight, quantity and request.
Q: If we don’t have drawing, can you make drawing for me?
A: Yes, we make the drawing of your sample and duplicate the sample.
Q: When can I get the sample?
A: Sample: 25-30 days after you start to make mold. The accurate time depends on your product.
Q: What is your main order time?
A: Order time: 35-40 days after the payment. The accurate time depends on your product.
Q: What is your payment method?
A: Tooling: 100% TT advanced.
Main order: 50% deposit, balance 50% to be paid before shipment.